|
|
|
|
 |
Show
Time: |
May.9th (Wed.)-11th
(Fri.),2012
09:30 ~ 17:00 on May. 9 (Wed.) - 10 (Thu.)
09:30 ~ 16:30 on May. 11 (Fri.) |
Move-in: |
May. 6 (Sun.) – 8 (Tue.), 2012 |
Move-out: |
16:30 ~ 20:00 on May. 11, 2012 whole day on May. 12 (Sat.), 2012 |
Venue: |
Expo Plaza, Xiandai Avenue, Suzhou Industrial Park, Suzhou Jiangsu Province, China |
Show Scale: |
Suzhou International Expo Center Hall 3A,4A,5A |
Organizer: |
Center of Strait Economy & Science-Tech Coop. |
Co-organizer: |
Tawian Printed Circuit Association (TPCA) |
Co-supporter: |
Eastern China PCB Friendship Association
Southern China PCB Friendship Association |
| Executer: |
Chan Chao International Co., Ltd.
TPCA Suzhou Office
Paper Communication Exhibition Services |
|
|
Exhibit Profile |
◎Printed Circuit Boards: All boards, multilayer boards, flexible circuit, design, EMS.
◎Printed Circuit Boards Equipment: Wet/Dry processing equipment, PCB test equipment
◎Printed Circuit Boards Raw Materials & Chemicals
◎Peripheral Equipment & Components
◎SMT & Electronic Assembly Equipment and Materials
◎Automation Control Equipment
|
|
Co-exhibition |
- Companies are allowed to join the exhibition together only when their produts are correlative and connected.
- Co-exhibitors possess the right of the independent advertisement.
- Co-exhibition admissibility:
a. 2 companies join together; the booth amount should be at least 15 booths.
b. 3 companies join together; the booth amount should be at least 20 booths.
c. 4 companies or more are not allowed to exhibit together.
- Each booth of co-exhibitors will be imposed extra 5% advertisement fee.
- Exhibitor who applies for co-exhibition must submit the application separately and shall be accepted after judging and examining by the organizer.
|
|
Booth Rental |
 |
| Booth Type
(each booth=9 sqm) |
Application after
Nov.30 ,2011 |
Discounted
Fee for Application before
Nov.30 ,2011 |
| Standard Booth |
RMB 11,700 |
RMB 10,200 |
| Raw Space
|
RMB 11,000 |
RMB 9,500 |
|
*Note
1.If pay by USD/NTD, please refer to the exchange rate of the payment request date.
2.Standard Booth is equipped with:
3 x Partitions, Carpet, Company Fascia, 3 x Spot Lights, 1 x Information desk, 2 x Chairs, 1 x socket (with 500W non-lighting electrical supply) |
|
|
Booth Selection |
Scheduled in January, 2012. Exhibitors subscribing for more booths will have the priority to select booth location. For same number of booths, the selection priority will be based on the date of application. For same number of booths and same date of application, the priority goes to exhibitors who pay the booth rental earlier.
Note: The selection only valid if the deposit or full payment has been made. |
|
Scheduled Activities |
 |
|
Marketing Plan |
Marketing goal-mass spread of show information,
invite buyers for visiting and purchasing, exhibitors achieve
the exhibition goal
 |
|
Security Notice |
- The organizer will provide general security to ensure the control of the in and out during show time (includes move-in and move-out). However, the primary responsibility for safeguarding your exhibit and merchandise is yours. Remember that move-in and move-out periods are particularly sensitive times when thefts (especially your handbag and laptop) are most likely to occur. Do not leave your booth unattended during those times. The security and organizer are not responsible for the loss or damage of any property from any cause.
- Exhibitors should take full responsibility on the property damage or staff injury which caused from the inappropriate construction, occupation, maintenance or management during show time (includes build up and dismantling time).
- The organizer reserves the right for the reaction on the occurrence of natural disaster such as typhoon, earthquake, and public infection, fire, flood… etc., which may brake on the exhibition.
- The regulation on the booth decoration and the security is based on the one established by “Suzhou International Expo Center”.
|
|
Application Information |
- Fill out the Application Form with the stamp of the
company and the signature of the person in charge
- Return the application by fax or post, please states “Apply
for 2012 Suzhou PCB Show” if by post
|
|
Payment Terms |
- 50% of payment is required within
30 days after application. To entitle the first stage
of booth selection. (Executer will give notice to pay, either
in cheque or by T/T.)
◎Note1:If pay by cheque, deposit date to be made out to
the same month as application date, at sight.
◎Note2:If pay by T/T, deposit to be made in the same month
as application date, all bank charges are for applicant’s
account,please fax the payment receipt to the executer (states
the applicant’s company name)
- The 50% remaining should be paid
within 20 days after confirming the booth location
(Executer will give notice to pay, either in cheque or by
T/T.)
◎Note1:If pay by cheque, the balance must be paid before March 31, 2012, at sight.
◎Note2:If pay by T/T , balance to be paid before January 31, 2012.
All bank charges are for applicant’s account, fax the payment
confirmation
to the executer (states the applicant’s company name)
- 3. The full payment is required for applications after January 1, 2012
|
|
Withdrawal from the Exhibition |
- No refund if the deposit has been paid.
- If full payment has been paid, refund 50% booth rental
if withdraw before
February 28, 2012. No refund after March 1, 2012.
|
|
Executers |
Taiwan
3F,No.185,Kangchien Rd.,Neihu Dist,Taipei,Taiwan
TEL:+886-2-26596000
FAX:+886-2-26597000
Contact:Ms. Serene Yen (ext.315)
E-mail:ctex@circuitex.com
|
China
Room718, LACCA Building,No.8 Jiarui Xiang,SIP,Jiangsu
TEL:+86-512-68074151
FAX:+86-512-68074152
mobile:+86-138-62104012
Contact:Ms. Sarah Lee
E-mail:show@pcbshop.org |
|
| |
|